- RD-11-02-2006 — guidelines on the composition and procedure for maintaining executive documentation.
- SP (Code of Practice) and SNiP are current industry standards for general construction work, installation of utility networks and ventilation.
- GOST — state standards for the preparation of drawings, diagrams, and maintenance of executive logs.
- PUE — Electrical Installation Rules for all types of electrical systems.
Our range of services: From construction measurements to the finished package
We carry out both individual stages and the entire cycle of work on site:
1. Engineering construction measurements:
- We travel to the site to carry out manual and laser measurements without the use of cumbersome surveying equipment.
- We take precise physical measurements of structures, cable routes, and pipelines.
- We fix the elevation marks (levels) of the finished floor/ceilings, the slopes of the pipes and the connections of the networks to the walls and partitions.
2. Transferring data to a drawing:
- We digitize the obtained measurements and transfer them to graphics programs (AutoCAD / nanoCAD).
- We draw executive plans, sections, axonometric and single-line diagrams.
3. Preparation and calculation of volumes (VOR):
- We calculate the exact amount of work actually completed and materials consumed.
- We prepare cable logs, specifications, and bills of quantities.
4. Network testing recording:
- We help you correctly document the results of hydraulic testing of systems for leaks (pressure testing).
- We help record the results of electrical measurements.
5. Coordination and delivery:
- We defend volumes before technical supervision (construction control) and the customer.
- We submit a complete set of documents, ready for any inspections.
Incoming inspection and accounting of building materials
A high-quality executive folder is impossible without confirmation of the reliability of the materials. We handle all incoming inspections:
- Register (list) of materials used: we create an ordered list of all materials purchased and installed at the site (from concrete and reinforcement to pipes, cables, and circuit breakers).
- Collection of quality data sheets and certificates: We select and link valid manufacturer data sheets, certificates of conformity, and fire safety declarations to each material.
- Incoming inspection log: We fill out the official log of incoming materials in accordance with all Ministry of Construction regulations. No material will be left without documentary confirmation!
Sample documents and download templates
1. General construction and hidden works
2. Mechanical systems (Heating, Plumbing, Ventilation)
3. Electrical systems (EOM, Grounding)
- The Certificate of Technical Readiness of Electrical Installation Works is a document confirming that installation has been completed in accordance with the Electrical Installation Code (PUE) and the network is ready for commissioning..
- Electrical laboratory protocols - forms for measuring cable insulation resistance and grounding circuits.
- Cable log and single-line diagrams - tables with cable routes and actual panel diagrams.
4. Documents for materials